| |
TM 9-2320-364-20-4
11-10
Materials/Parts
Cable Ties (Item 25, Appendix C)
Cable Ties (Item 26, Appendix C)
Sealing Compound (Item 72, Appendix C)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Materials/Parts - Continued
Tags, Identification (Item 88, Appendix C)
Packing, Preformed (2) (Item 257, Appendix F)
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Air system drained, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Cap and Plug Set (Item 8, Appendix G)
11-6. AXLE NO. 2 LOCKING CYLINDER LINES AND FITTINGS REPLACEMENT.
a.
Removal.
NOTE
Tag and mark air lines prior
to removal.
Cap or plug all hoses, tubes,
fittings and openings as each
item is removed.
Note location and remove
cable ties as required.
(1)
Disconnect air line 2420 (1) from fitting (2).
(2)
Remove fitting (2) from locking cylinder (3).
(3)
Remove washer (4) and preformed
packing (5) from fitting (2). Discard
preformed packing.
(4)
Disconnect air line 2056 (6) from fitting (7).
(5)
Remove fitting (7) from locking cylinder (8).
(6)
Remove washer (9) and preformed
packing (10) from fitting (7). Discard
preformed packing.
|