| |
TM 9-2320-364-20-4
12-30
Materials/Parts
Grease (Item 44, Appendix C)
Sealing Compound (Item 72, Appendix C)
This task covers:
a. Front Air Chamber Replacement
b. Rear Air Chamber Replacement
c. Follow-On Maintenance
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Air system drained, (TM 9-2320-364-10)
Wheel and tire removed, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Socket Set, 3/4 in. (Item 61, Appendix G)
Wrench, Spanner (Item 94, Appendix G)
Wrench, Torque (0 to 300 lb-ft [0 to 407 N.m])
(Item 96, Appendix G)
12-9. AXLES NO. 1 AND 2 AIR CHAMBER REPLACEMENT.
Materials/Parts - Continued
Sealing Compound (Item 81, Appendix C)
Tags, Identification (Item 87, Appendix C)
NOTE
Tag and mark air lines prior to removal.
Refer to Table 12-1 for air line numbers.
Axle No. 1 and 2 air chambers, left and right side are removed the same way. Axle No. 1
left side shown.
(1)
Removal.
(a)
Remove air line (1) from fitting (2).
(b)
Remove air line (3) from fitting (4).
|