TM 9-2320-364-20-4
12-29
c.
Follow-On Maintenance:
Install instrument panel, (Para 7-13).
Start engine, (TM 9-2320-364-10).
Build up air pressure to 125 psi (861 kPa).
Check operation of switch, (TM 9-2320-364-10).
Shut OFF engine, (TM 9-2320-364-10).
Check for air leaks, (TM 9-2320-364-10).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|