Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5 15-4      15-2.  SKID PLATE REPLACEMENT (CONT). (6) Tighten nine self-tapping screws (14) and eight self-tapping screws (13). (7) Remove lifting device from skid plate (4). NOTE Perform Step (8) if truck is not equipped with machine gun ring. (8) Install four washers (10), screws (9) and locknuts (8) in skid plate (4). (9) Install skid plate blackout lamp guard (7), with two lockwashers (6) and screws (5) on skid plate (4). (10) Install skid plate window guard (3) with two lockwashers (2) and screws (1) on skid plate (4). c. Follow-On Maintenance: Install machine gun front support (if equipped), (Para 22-4). Install machine gun ring (if equipped), (Para 22-2). Install cab steps, (Para 15-5). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business