| |
TM 9-2320-364-20-5
18-20
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Engine ON (running), (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
End of boom at working level,
(TM 9-2320-364-10)
Hoist cable payed out, (TM 9-2320-364-10)
Crane hook block and clevis removed,
(Para 18-8)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Gloves, Heavy Duty (Item 29, Appendix G)
18-5. CRANE HOIST CABLE REPLACEMENT.
a.
Removal.
Wear heavy gloves when handling crane cable. Never let cable run through hands; frayed
cables can cut.
NOTE
Use punch on wedge inside retainer.
(1)
Knock out and remove wedge (1).
(2)
Straighten cable (2) and remove from retainer (3) of hoist drum (4).
|