| |
TM 9-2320-364-20-5
18-21
b.
Installation.
Wear heavy gloves when handling crane cable. Never let cable run through hands; frayed cable
can cut.
(1)
Lay cable (2) out on level surface and remove loops.
(2)
With the aid of an assistant, feed cable (2) over sheave pulley (5) and thread through hoist drum (4) from
inside to outside of reel.
(3)
Feed cable (2) up through retainer (3) and loop back around.
(4)
Position wedge (1) inside looped cable (2). Tighten cable around wedge until 1 in. (25.4 mm) of cable
extends out of retainer (3).
c.
Follow-On Maintenance:
Install hook block and clevis, (Para 18-8).
Reel in hoist cable, (TM 9-2320-364-10).
Load test crane, (TM 9-2320-364-34).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|