| |
TM 9-2320-364-20-5
18-22
Material/Parts
Cloth, Cleaning (Item 34, Appendix C)
Oil, Hydraulic (Item 50, Appendix C)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Crane hoist cable payed out approximately
1 ft (0.3 m), (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Cap and Plug Set (Item 8, Appendix G)
Gloves, Chemical Oil Protective
(Item 28, Appendix G)
Goggles, Industrial (Item 30, Appendix G)
Pan, Drain 4 gal (Item 47, Appendix G)
Soldering Kit, Torch
(Item 64, Appendix G)
Vise, Machinists (Item 75, Appendix G)
Wrench, Torque (0 to 175 lb-ft [0 to 237 N.m])
(Item 95, Appendix G)
18-6. RETAINER BAR/ROLLER REPLACEMENT.
Material/Parts - Continued
Sealing Compound (Item 72, Appendix C)
Lockwasher (4) (Item 154, Appendix F)
Lockwasher (4) (Item 168, Appendix F)
Lockwasher (8) (Item 171, Appendix F)
Lockwasher (2) (Item 173, Appendix F)
Packing, Preformed (2) (Item 229, Appendix F)
Packing, Preformed (Item 248, Appendix F)
|