| |
TM 9-2320-364-20-5
19-63
Materials/Parts
Sealing Compound (Item 72, Appendix C)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Cab engine access panel removed, (Para 17-24)
Electronic Control Box (ECB) right side panel
removed, (Para 17-21)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Drain Pan (Item 47, Appendix G)
19-18. HEATER CONTROL VALVE REPLACEMENT.
a.
Removal.
Allow engine to cool prior to removal of valve to prevent burns and possible injury to
personnel.
(1)
Set heater control panel OFF/HEAT control (1) to HEAT position.
|