| |
TM 9-2320-364-20-5
19-64
19-18. HEATER CONTROL VALVE REPLACEMENT (CONT).
NOTE
Remaining steps are performed inside cab.
Valves are closed by turning clockwise.
(2)
Close two valves (2) at right front of engine.
(3)
Loosen clamp screw (3) and remove control cable (4) from clamp (5) and valve lever (6).
|