| |
TM 9-2320-364-20-5
20-52
20-12. MAIN HYDRAULIC RESERVOIR REPLACEMENT (CONT).
(24) Connect connector (4) on fluid level
gage (5).
(25) Install preformed packing (2) and hose
2918 (1) on fitting (3).
c.
Follow-On Maintenance:
Fill main hydraulic reservoir, (Para 20-11).
Start engine and allow to idle for five minutes, (TM 9-2320-364-10).
Shut off engine and check for hydraulic leaks, (TM 9-2320-364-10).
Install cab engine access panel, (Para 17-24).
Install right fender front skirt, (Para 17-33).
Install right side noise panel, (Para 17-26).
Install Electronic Control Box (ECB), right side panel, (Para 17-21).
Install spare tire carrier and davit, (Para 15-21).
Install spare tire, (TM 9-2320-364-10).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|