| |
TM 9-2320-364-20-5
21-176
21-35. CONTAINER HANDLING UNIT (CHU) LIFTING FRAME ASSEMBLY
REPLACEMENT (CONT).
(3)
Remove lock pin (7) and pin (8) from lifting
frame stow bracket (9).
(4)
Remove two swaging sleeves (10) and wire
rope (11) from pin (8) and lock pin (7).
(5)
Remove lock pin (12), collar (13), pin (14)
and lifting hook (15) from slide arm (4).
(6)
Remove two swaging sleeves (16) and wire
rope (17) from pin (14) and lock pin (12).
Slide arm weighs 65 lbs (29 kg).
Attach suitable lifting device to
prevent possible injury to
personnel.
(7)
Attach lifting device to slide arm (4).
(8)
With the aid of an assistant, remove slide
arm (4) from lifting frame (18).
(9)
Remove lifting device from slide arm (4).
9
17
7
8
10
11
12
13
14
4
16
15
16
18
10
|