Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Follow-on Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5 21-222 21-44.   CONTAINER HANDLING UNIT (CHU) STOW WELDMENT REPLACEMENT (CONT). NOTE Measurements should be taken on both sides of cone weldment. If measurement “B” is not 5.87 in. (15 cm) 0.125 in. (3.18 mm), perform Steps (4) through (6). If measurement “B” is 5.87 in. (15 cm) 0.125 in. (3.18 mm), go to Step (8). (2) Measure distance between base of stow cone weldment (1) and LHS hook arm (4). Record as measurement “B”. (3) Remove six locknuts (5), screws (6), stow cone weldment (1) and shim(s), as required, (7) from front support assembly (8). Discard locknuts and shim(s). (4) Remove six locknuts (5) and screws (6) from cone weldment (1) and front support assembly (8). Discard locknuts. (5) Position stow cone weldment (1) to proper position to achieve measurement “B”. (6) Install stow cone weldment (1) and shim(s) (7) on front support assembly (8) with six screws (6) and locknuts (5). (7) Repeat Steps (1) and (2). (8) Remove lifting device from stow cone weldment (1). d. Follow-on Maintenance: Install remainder of stow weldment, (Para 21-34). Install CHU air cylinders and rotary paddles, (Para 21-43). Wheels chocked, (TM 9-2320-364-10). END OF TASK 1 7 6 5 8 B 3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business