| |
TM 9-2320-364-20-5
21-222
21-44. CONTAINER HANDLING UNIT (CHU) STOW WELDMENT
REPLACEMENT (CONT).
NOTE
Measurements should be
taken on both sides of cone
weldment.
If measurement B is not
5.87 in. (15 cm) 0.125 in.
(3.18 mm), perform Steps (4)
through (6).
If measurement B is 5.87
in. (15 cm) 0.125 in. (3.18
mm), go to Step (8).
(2)
Measure distance between base of stow
cone weldment (1) and LHS hook arm (4).
Record as measurement B.
(3)
Remove six locknuts (5), screws (6), stow
cone weldment (1) and shim(s), as required,
(7) from front support assembly (8).
Discard locknuts and shim(s).
(4)
Remove six locknuts (5) and screws (6)
from cone weldment (1) and front support
assembly (8). Discard locknuts.
(5)
Position stow cone weldment (1) to proper
position to achieve measurement B.
(6)
Install stow cone weldment (1) and shim(s)
(7) on front support assembly (8) with six
screws (6) and locknuts (5).
(7)
Repeat Steps (1) and (2).
(8)
Remove lifting device from stow cone
weldment (1).
d.
Follow-on Maintenance:
Install remainder of stow weldment, (Para 21-34).
Install CHU air cylinders and rotary paddles, (Para 21-43).
Wheels chocked, (TM 9-2320-364-10).
END OF TASK
1
7
6
5
8
B
3
|