| |
TM 9-2320-364-20-5
22-8
Materials/Parts
Locknut (5) (Item 91, Appendix F)
This task covers:
a. Installation
b. Storage
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
22-5. MACHINE GUN PLATFORM INSTALLATION/STORAGE.
a.
Installation.
(1)
Remove eight screws (1) and right Electronic Control Box (ECB) cover (2) from right ECB (3).
(2)
Remove eight screws (4) and heater access panel (5) from heater compartment (6).
(3)
Remove five plugs (7) from right ECB (3) and heater control side panel (8).
(4)
Install platform bracket (9) on right ECB (3) and heater control side panel (8) with five screws (10),
washers (11) and locknuts (12).
|