| |
TM 9-2320-364-20-5
24-2
This task covers:
a. Installation
b. Follow-On Maintenance
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Electronic Control Box (ECB) cover removed,
(Para 17-22)
Electronic Control Box (ECB) side panel
removed, (Para 17-20)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
24-2. GAS PARTICULATE FILTER UNIT KIT MOUNTING/INSTALLATION.
Materials/Parts
Locknut (2) (Item 91, Appendix F)
Locknut (Item 120, Appendix F)
Lockwasher (Item 171, Appendix F)
a.
Installation.
(1)
Remove blank insert (1) from Electronic
Control Box (ECB) side panel (2).
(2)
Install gas particulate filter switch S19 (3) in
ECB side panel (2).
(3)
Install lamp (4) in bottom of gas particulate
filter switch S19 (3).
(4)
Connect wire harness MC58 connector (5) to
gas particulate switch S19 (3).
(5)
Install applique (6) on front of gas
particulate switch S19 (3).
|