Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-2 3-102      3-12.  CRANKCASE FRONT COVER AND OIL SEAL REPLACEMENT (CONT). (19) Position two washers (7) and screws (6) in lower trunnion assembly (8). (20) Lower lifting device until lower trunnion support assembly (8) is fully seated. (21) With the aid of an assistant, install two washers (5), washers (4) and locknuts (3) on two screws (6).  Tighten locknuts to 170 lb-ft (231 N.m). (22) Remove lifting device from lifting bracket (1) on engine (2). c. Follow-On  Maintenance: Install vibration damper, (Para 3-11). Install engine oil pan, (Para 3-22). Install alternator, (TM 9-2320-364-20). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business