| |
TM 9-2320-364-34-2
6-64
6-8. OVERLOAD SHUTDOWN SYSTEM REPLACEMENT (CONT).
(3)
Connect connectors (8), (7) and (6) on
overload control box (9).
(4)
Position cable (3) on mast pin (5) with nut (1)
spacer (4) and screw (2). Tighten nut against
boom.
c.
Follow-on Maintenance:
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|