| |
TM 9-2320-364-34-2
6-303
(b)
Remove four nuts (3), lockwashers (4), washers (5), washers (6), screws (7) and cover (8) from
bracket (9). Discard lockwashers.
NOTE
Overload shutdown
solenoid shown. There
are 14 control valves;
wiring to all control valve
connectors is removed the
same way.
(c)
Loosen screw (10) and remove
connector (11) and square seal (12)
from control valve (13).
|