| |
TM 9-2320-364-34-2
6-325
Materials/Parts
Cable Ties (Item 9, Appendix B)
Tags, Identification (Item 72, Appendix B)
Locknut (23) (Item 176, Appendix E)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
LHS fully extended, (TM 9-2320-364-10)
Batteries disconnected, (TM 9-2320-364-10)
Left side noise panel removed,
(TM 9-2320-364-20)
Electronic Control Box (ECB) right side
panel removed, (TM 9-2320-364-20)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
6-34. 24 VOLT TRAILER WIRE HARNESS REPLACEMENT.
a.
Removal.
NOTE
Remove cable ties as required.
Tag and mark all wire connectors prior to removal.
(1)
Loosen screw (1) and disconnect MC25 connector (2).
NOTE
Disconnect connector by gently prying up on tabs and pulling apart connector.
(2)
Disconnect MC120 connector (3).
|