Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Post Welding Procedures
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-2      6-417 NOTE Perform Step (40) if truck is equipped with crane. (40) Disconnect connectors (134), (135) and (136) from crane overload box (137). b. Welding.  Refer to TC 9-237 for welding procedures. c. Post Welding Procedures. NOTE Perform Step (1) if truck is equipped with crane. (1) Connect connectors (136), (135) and (134) on crane overload box (137). (2) Connect connectors MC83 (132) and MC81 (133) on LHS control box (130). (3) Install LHS control box (130) and guard (129) in console (131) with eight screws (128).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business