Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-2 6-428      6-39.  GENERAL WELDING MAINTENANCE (CONT). Corrosion compound contains alkali.  Do not get in eyes; wear goggles/safety glasses when using.  Avoid contact with skin.  In case of contact, immediately wash area with soap and water.  If eyes are contacted, flush eyes with large amounts of water at least 15 minutes and get immediate medical attention. (47) Apply anticorrosion compound to positive posts (11), (12), (13) and (14) and negative posts (3), (4), (7) and (8) and eight terminals (2). d. Follow-On  Maintenance: Install left side noise panel, (TM 9-2320-364-20). Install front side noise panel, (TM 9-2320-364-20). Install Electronic Control Box (ECB) cover, (TM 9-2320-364-20). Install DUVAC control cover (145 AMP only), (TM 9-2320-364-20). Install reverse polarity protection cover (200 AMP only), (TM 9-2320-364-20). Battery box cover installed, (TM 9-2320-364-10). Wheel chocked removed, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business