| |
TM 9-2320-364-34-3
14-31
e.
Installation.
The trailing beam weighs 150 lbs
(68 kg). Attach a suitable lifting
device to truck end of trailing
beam prior to removal or
installation to prevent possible
injury to personnel.
(1)
Support truck end of trailing beam (2) with a
hydraulic jack.
(2)
Install plastic bushing (15) in each trailing
beam (2).
NOTE
The following step may require
use of a soft faced hammer to
position trailing beam.
(3)
Apply lubricating oil to threads of
screw (13).
(4)
With the aid of an assistant and a hydraulic
jack, position end of trailing beam (2) in
trailing beam mount (16).
(5)
Install screw (13) and locknut (14) in trailing
beam (2).
(6)
With the aid of an assistant, hold screw (13)
and tighten locknut to 600 lb-ft (814 N.m).
|