| |
TM 9-2320-364-34-3
16-31
(7)
Install two clamps (160) on tube (161) with
four screws (159). Tighten screws to 72
lb-in (8 N.m).
(8)
Install tube (156) and clamp (158) on boom
base section (4) with two screws (157).
Tighten screws to 72 lb-in (8 N.m).
(9)
Connect tube (155) to tube (156).
(10)
Install two clamps (154) on tube (155) with
four screws (153). Tighten screws to 72
lb-in (8 N.m).
NOTE
Perform Step (11) if bushing was
removed.
(11)
Install bushing (150) in roller (148).
NOTE
When installing pin, position
grease hole in vertical, top-to-
bottom position.
(12)
Install roller assembly (148) and pin (147)
in tube weldment (128).
|