| |
TM 9-2320-364-34-3
16-30
16-3. BOOM ASSEMBLY REPAIR (CONT).
(4)
Clean metal wear pads, spacers, and shims in dry cleaning solvent.
(5)
Clean chains and cable in drycleaning solvent and inspect for broken lines or wear.
(6)
Dry all parts with clean cloth.
(7)
Replace damaged or worn parts.
d.
Assembly.
NOTE
Perform Steps (1) through (8)
only if boom base section was
disassembled. Otherwise, go to
Step (9).
(1)
Install angle data plate (176) on boom base
section (4) with four rivets (175).
(2)
Repeat Step (1) for remaining angle data
plate.
(3)
Install clamp (174), tube (162) and
retainer (173) on front of boom base
section (4) with two screws (172). Tighten
screws to 72 lb-in (8 N.m).
(4)
Connect tube (171) to tube (162).
(5)
Install clamp (170) on tube (171) with
screw (169). Tighten screws to 72 lb-in
(8 N.m).
(6)
Install tube (168), three clamps (167),
spacers (164) and ground strap (166) on
boom base section (4) with lockwasher
(165) and three screws (163). Tighten
screws to 72 lb-in (8 N.m).
174
172
162
173
169
167
163
170
171
168
167
167
163
163
4
166
165
164
164
164
|