| |
TM 9-2320-364-34-3
16-38
16-3. BOOM ASSEMBLY REPAIR (CONT).
Structural section weighs 175 lbs
(79 kg). Attach suitable lifting
device prior to installation to
prevent possible injury to
personnel.
(53)
Using lifting device, position structural
section (91) on opposite side.
NOTE
Ensure chain and cable are
straight and not binding.
(54)
With the aid of an assistant, guide structural
section (91) into fly section (64).
(55)
Remove cable tie in fly section (64) and
position cable (34) in cable retainer (90).
Adhesives, solvents, and sealing
compounds can burn easily, can
give off harmful vapors, and are
harmful to skin and clothing. To
avoid injury or death, keep away
from open fire and use in a well-
ventilated area. If adhesive,
solvent, or sealing compound gets
on skin or clothing, wash
immediately with soap and
water.
(56)
Apply sealing compound to threads of two
screws (83).
(57)
Install cable retainer (89) in cable retainer
weldment (90) with two lockwashers (88)
and screws (87). Tighten screws to 108
lb-in (12 N.m).
(58)
Install plate (86) in fly section (64) with
four washers (85), lockwashers (84) and
screws (83). Tighten screws to 72 lb-in
(8 N.m).
|