| |
TM 9-2320-364-34-3
16-51
NOTE
If outer-mid section fit is tight,
install C-clamp on outer-mid
section and base section and use
clamp to push outer-mid
section inward.
Ensure equalizer link weldment
is properly installed.
(131)
With the aid of an assistant, push inner-mid
section (20) and base section (4) completely
together while routing end of equalizer link
weldment (19) from inner-mid section (20)
through hole in rear of base section (4).
(132)
Install washer (18), nut (17) and jam
nut (16) on equalizer link weldment (19).
Adhesives, solvents, and sealing
compounds can burn easily, can
give off harmful vapors, and are
harmful to skin and clothing. To
avoid injury or death, keep away
from open fire and use in a well-
ventilated area. If adhesive,
solvent, or sealing compound gets
on skin or clothing, wash
immediately with soap and water.
(133)
Apply sealing compound to threads of four
screws (1).
(134)
Install cable guide (3) with four washers (2)
and screws (1). Tighten screws to 16 lb-ft
(22 N.m).
(135)
Position shims (11) and wear pad (12) on
base section (4).
At least 0.06 in. (1.5 mm) of
clearance is required between
highest spot on inner-mid
section and bottom of wear pads
or section may not operate
properly or damage to
equipment may result.
(136)
Check clearance between base section (4)
and wear pad (12) and add or subtract
shims (11) as required.
|