| |
TM 9-2320-364-34-3
16-70
16-7. LIFT CYLINDER HOLDING VALVE REPLACEMENT (CONT).
b.
Installation.
NOTE
Holding valves are installed the same way on left and right side cylinders.
(1)
Apply hydraulic oil to preformed packing (2).
(2)
Install holding valve (1) and preformed packing (2) on lift cylinder (3).
c.
Follow-On Maintenance:
Load test crane, (Para 16-32).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|