Install nine shims (20) left-hand outrigger
valve (21), mast valve (22) and right hand
outrigger valve (23) on manifold (24) with
three studs (19), six lockwashers (18) and
nuts (17). Tighten nuts to 20 to 23 lb-ft
(27 to 31 N.m).
(7)
Apply hydraulic oil to preformed
packings (14) and (15).
(8)
Install preformed packings (14) and (15)
fittings (12) and (13) in three valve
bank (16).
(9)
Apply hydraulic oil to preformed
packings (8), (9), (10) and (11).
(10)
Install preformed packings (8), (9), (10)
and (11), elbow (7) and fittings (4), (5)
and (6) in three valve bank (16).
e.
Installation.
(1)
Install three valve bank (4) on left and right
brackets (23) and (24) with four
lockwashers (22) and screws (21). Tighten
screws to 72 lb-in (8 N.m).
|