| |
TM 9-2320-364-34-3
16-198
16-27. THREE FUNCTION CONTROL VALVE BANK REPAIR (CONT).
(2)
Apply hydraulic oil to preformed
packings (19) and (20).
(3)
Install preformed packings (19) and (20) and
hoses (15) and (16) on fittings (17) and
elbows (18).
(4)
Apply hydraulic oil to preformed
packing (14).
(5)
Install preformed packing (14) and connect
tube (12) on elbow (13).
(6)
Apply hydraulic oil to preformed
packing (11).
(7)
Install preformed packings (11) and connect
tube (7) on fitting (9) and elbow (10).
(8)
Apply hydraulic oil to preformed
packing (8).
(9)
Install preformed packing (80 and connect
hose (6) on tube (7).
(10)
Apply hydraulic oil to preformed
packing (5).
(11)
Install preformed packing (5) and connect
hose (2) on elbow (3) on three function
control valve bank (4).
f.
Follow-On Maintenance:
Start engine and check for leaks, (TM 9-2320-
Shut off engine, (TM 9-2320-364-10).
Check hydraulic fluid level, (TM 9-2320-364-20).
Install crane stowage box, (TM 9-2320-364-20).
Load test crane, (Para 16-32).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|