Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: f. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 16-264 16-40.  LOAD HANDLING SYSTEM (LHS) MIDDLE FRAME REPAIR (CONT). Main cylinders weigh 325 lbs (148 kg).  Attach suitable lifting device prior to installation to prevent possible injury to personnel. (9) Attach lifting device to left main cylinder (1). (10) Using lifting device, lift main cylinder into installation position. Use care when installing retaining rings.  Retaining rings are under tension and can act as projectiles when released causing injury to personnel. (11) Install pivot pin (4), shim (3) and retaining ring (2) on middle frame (5) and main cylinder (1). (12) Remove lifting device from main cylinder (1). (13) Repeat Steps (8) through (11) for right main cylinder (1). f. Follow-On  Maintenance: Install LHS junction box, (TM 9-2320-364-20). Install middle frame tubes, (Para 16-41). Install proximity switch (hook arm up), (TM 9-2320-364-20). Install proximity switch (main frame down), (TM 9-2320-364-20). Install hook arm, (Para 16-39). Connect batteries, (TM 9-2320-364-20). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business