| |
TM 9-2320-364-34-3
18-40
18-3. ALTERNATOR KIT INSTALLATION (200 AMP) (CONT).
NOTE
Wires in Steps (93) through (98) are part of 200 AMP polarity wire harness.
(93)
Position 200 AMP polarity wire harness (23) in ECB (158) through grommets (159).
(94)
Position wire 1075 (160), lockwasher (161) and nut (162) on solenoid (163). Tighten nut to 30 to 35 lb-in
(3 to 4 N.m).
(95)
Position wire 1281 (164), lockwasher (165), and nut (166) on solenoid (167). Tighten nut to 30 to 35 lb-in
(3 to 4 N.m).
(96)
Position wire 1430 (168), lockwasher (169) and nut (170) on solenoid (171). Tighten nut to 30 to 35 lb-in
(3 to 4 N.m).
(97)
Install wire 1866 (172), lockwasher (173) and screw (174) on circuit breaker CB12 (175).
(98)
Install wire 1079 (176), lockwasher (177) and screw (178) on circuit breaker CB5 (179).
162
161
160
178
177
176
174
173
164
167
170
169
168
166
165
163
175
172
179
159
158
171
23
|