| |
TM 9-2320-364-34-3
18-53
(6)
Cut eyelet from wire harness (8) red wires, strip back insulation 3/8 in. (10 mm) and install
connector (11). Discard eyelet.
(7)
Install connector (11) on circuit breaker CB19 (12).
(8)
Install five screws (13), ten lockwashers (14), five nuts (15) and mounting base (16) on right cover (4).
NOTE
Leave right rear two screws holes
open.
(9)
Install right ECB cover (4), left ECB
cover (3) with 15 screws (1) on ECB (5)
|