TM 9-2320-364-34-3
18-149
NOTE
Measurements should be
taken on both sides of cone
weldment.
If measurement B is not
5.87 in. (15 cm) 0.125 in.
(3.18 mm), perform Steps
(43) through (45).
If measurement B is 5.87
in. (15 cm) 0.125 in. (3.18
mm), go to Step (47).
(41)
Measure distance between base of cone
weldment (62) and LHS hook arm (64).
Record as measurement B.
(42)
Remove six locknuts (65), screws (66),
cone weldment (62) and shim(s), as
required, (67) from front support assembly
(51). Discard locknuts and shim(s).
(43)
Remove six locknuts (65) and screws (66)
from cone weldment (62) and front support
assembly (51). Discard locknuts.
(44)
Position cone weldment (62) to proper
position to achieve measurement B.
NOTE
Locknuts can be found in box F,
pack no. 70 of CHU kit crate.
(45)
Install cone weldment (62) and shim(s)
(67) on front support assembly (51) with
six screws (66) and locknuts (65).
(46)
Repeat Steps (40) and (41).
(47)
Remove lifting device from stow weldment
(59).
62
67
66
65
51
B
64
59
|