| |
TM 9-2320-364-34-3
18-274
18-15. CONVERT DDEC II CAB ASSEMBLY TO DDEC III CAB ASSEMBLY (CONT).
(45)
Install heat shrink (45) over end of wire
1435 (42) and seal using heat gun.
(46)
Install wire 953 (46) of kit harness in
position B (41) on MC102 connector (38).
(47)
Close two secondary locks (40) on MC102
connector (38).
(48)
Connect MC102 connector (38) on DDEC
6.8k resistor (39).
(49)
Remove two 24 volt relays (47) from relay
sockets R24 (48) and R22 (49).
(50)
Remove screw (50) and lockwasher (51)
from relay socket R24 (48). Discard
lockwasher.
(51)
Remove relay sockets R24 (48), R23 (52)
and R22 (49) from ECB (53).
|