| |
TM 9-2320-364-34-4
23-21
Materials/Parts
Cable Ties (Item 9, Appendix B)
Oil, Hydraulic (Item 34, Appendix B)
This task covers:
a. Removal
c. Cleaning/Inspection
e. Installation
b. Disassembly
d. Assembly
f. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
First shift valve removed, (Para 23-7)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Bit Set, Screwdriver (Item 17, Appendix F)
Pliers, Retaining Ring (Item 155, Appendix F)
Wrench Set, Socket 3/8 in. Drive
(Item 273, Appendix F)
Wrench, Torque (0-60 N.m)
(Item 276, Appendix F)
23-8. TRANSMISSION SOLENOID WIRING HARNESS REPAIR.
Materials/Parts - Continued
Solvent, Drycleaning (Item 68, Appendix B)
Tags, Identification (Item 72, Appendix B)
Gasket (Item 63, Appendix E)
Lockwasher (Item 243, Appendix E)
Packing, Preformed (Item 400, Appendix E)
Screw and Washer (4) (Item 547, Appendix E)
Seal (9) (Item 620, Appendix E)
|