| |
TM 9-2320-364-34-4
23-25
e.
Installation.
(1)
Align holes and install gasket (6) and
solenoid and solenoid harness assembly (4)
on separator plate (5).
NOTE
Tighten screws in circular
sequence starting with screw
closest to center.
(2)
Install nine screws (3) in solenoid harness
assembly (4). Tighten screws to 8 to 12 lb-ft
(11 to 16 N.m).
NOTE
Perform Steps (3), (4) and (5) if
bulkhead connector was
removed.
(3)
Apply hydraulic oil to preformed
packing (9).
(4)
Install preformed packing (9) on
connector (2).
(5)
Install bulkhead connector (2) in
transmission housing (10).
(6)
Install lockwasher (8) and connector nut (7)
on connector (2). Tighten to 60 to 68 lb-ft
(81 to 92 N.m).
(7)
Connect transmission wiring harness (1) to
bulkhead connector (2).
f.
Follow-On Maintenance:
Install first shift valve, (Para 23-7).
END OF TASK
|