Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: e. Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-4      23-25 e. Installation. (1) Align holes and install gasket (6) and solenoid and solenoid harness assembly (4) on separator plate (5). NOTE Tighten screws in circular sequence starting with screw closest to center. (2) Install nine screws (3) in solenoid harness assembly (4).  Tighten screws to 8 to 12 lb-ft (11 to 16 N.m). NOTE Perform Steps (3), (4) and (5) if bulkhead connector was removed. (3) Apply hydraulic oil to preformed packing (9). (4) Install preformed packing (9) on connector (2). (5) Install bulkhead connector (2) in transmission housing (10). (6) Install lockwasher (8) and connector nut (7) on connector (2).  Tighten to 60 to 68 lb-ft (81 to 92 N.m). (7) Connect transmission wiring harness (1) to bulkhead connector (2). f. Follow-On  Maintenance: Install first shift valve, (Para 23-7). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business