Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-4 25-42      25-11.  AXLE NO. 2 LOCKING CYLINDER REPLACEMENT (CONT). (20) Connect air supply hose to locking cylinder (7). (21) Using air supply hose, apply air pressure 100 to 120 psi (690-827 kPa) to locking cylinder (7). NOTE When locking cylinder engages both hub gears will turn in same direction, while rotating one wheel. (22) Turn flange assembly (16) back and forth until locking cylinder (7) engages. (23) Turn screw (1) slowly until screw contacts fork (17) in differential (8). (24) Using caliper, measure distance between face of washer (2) and top of locking cylinder (7) and record as measurement “B” (25) Determine shim (3) thickness.  Shim thickness is: measurement “B” - 0.004 in. (0.102 mm) to 0.020 in. (0.508 mm). (26) Remove screw (1) and washer (2). NOTE Shim thickness is determined in Step (25). (27) Install shim (3), washer (2) and screw (1). Tighten screw 25 to 32 lb-ft (34 to 43 N.m). (28) Remove air supply hose from locking cylinder (7). c. Follow-On  Maintenance: Install tie rod, (Para 25-9). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business