| |
TM 9-2320-364-34-4
25-122
Materials/Parts
Cloth, Cleaning (Item 11, Appendix B)
Sealing Compound (Item 56, Appendix B)
Locknuts (15) (Item 216, Appendix E)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Wheel hub assembly removed, (Para 25-20)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Respirator, Air Filter (Item 195, Appendix F)
Socket, Socket Head Screw, 14 mm
(Item 207, Appendix F)
Wrench Set, Socket, 3/4 in. Drive
(Item 274, Appendix F)
Wrench, Torque (0 to 600 lb-ft [0-814 N.m])
(Item 278, Appendix F)
Lifting Device, Minimum Capacity 80 lbs (36 kg)
25-21. AXLE NO. 3 AND 4 BRAKE ASSEMBLY REPLACEMENT.
a.
Removal.
Parts of the brake assembly may be coated with brake dust; breathing this dust can harm
personnel.
Use a filter mask approved for use against asbestos dust.
Never use compressed air or dry brush to clean these assemblies.
Use an industrial type vacuum cleaner with a high-efficiency filter system to remove dust.
Use water and a soft bristle brush or cloth to remove dirt or mud.
|