| |
TM 9-2320-364-34-4
28-30
This task covers:
a. Disassembly
b. Cleaning/Inspection
c. Assembly
INITIAL SETUP
Personnel Required
Two
Equipment Condition
Hoist assembly on clean work surface
Tools and Special Tools
Tool Kit, General Mechanics
(Item 240, Appendix F)
Compressor Unit, Air (Item 35, Appendix F)
Gloves, Chemical Oil Protective
(Item 81, Appendix F)
Goggles, Industrial (Item 83, Appendix F)
Gun, Airblow (Item 86, Appendix F)
Pan, Drain 6 gal (Item 145, Appendix F)
Pliers, Retaining Ring (Item 156, Appendix F)
Wrench Set, Socket, 3/8 in. Drive
(Item 273, Appendix F)
Wrench, Torque (0-60 N.m)
(Item 276, Appendix F)
Wrench, Torque (0-175 lb-ft [0-237 N.m])
(Item 277, Appendix F)
28-7. HOIST ASSEMBLY REPAIR.
Materials/Parts
Adhesive (Item 1, Appendix B)
Sealing Compound (Item 56, Appendix B)
Solvent, Drycleaning (Item 68, Appendix B)
Lockwasher (5) (Item 264, Appendix E)
Lockwasher (6) (Item 286, Appendix E)
Repair Kit, (Item 468, Appendix E)
Ring, Lock (3) (Item 477, Appendix E)
Ring, Lock (3) (Item 478, Appendix E)
Ring, Retaining (2) (Item 488, Appendix E)
a.
Disassembly.
(1)
Remove five screws (1), lockwashers (2)
and plate (3). Discard lockwashers.
(2)
Remove hoist drum (4) from housing (5).
|