|
|
![]() TM 9-2330-385-14
Section I. REPAIR PARTS, SPECIAL TOOLS, TEST, MEASUREMENT AND DIAGNOSTIC
EQUIPMENT AND SUPPORT EQUIPMENT
For authorized common tools and equipment refer to the Modified Table of Organization and Equipment (MTOE)
applicable to your unit.
Refer to Section III of the Maintenance Allocation Chart (MAC) for a list of tool kits authorized for the trailer.
4-3. REPAIR PARTS.
Repair parts are listed and illustrated in the Repair Parts and Special Tool List (RPSTL), TM 9-2330-385-24P,
covering Unit, Direct Support, General Support and Depot maintenance for the trailer.
Section II. SERVICE UPON RECEIPT
a. Unpacking. Upon receipt of a new trailer, the receiving organization must see if it has been properly prepared
for service and is in good condition. Inspect all assemblies, subassemblies, and accessories to be sure they are in proper
working order. Secure, clean, and correctly adjust and/or lubricate as needed, Para 4-8. Check all tools and
equipment (Appendix C and Appendix D) to be sure every item is there in good condition, clean and properly stowed.
b.
Deprocessing. Read all tags attached to the trailer and follow all precaution checks.
a.
General.
(1)
Refer to Chapter 2 for operating instructions for the trailer.
(2) Upon receipt of new, used, or reconditioned trailer, the receiving organization must see if it has been
properly prepared for service and is in good condition. Inspect all assemblies, subassemblies, and accessories to be
sure they are in proper working order. Secure, clean, and correctly adjust and/or lubricate, Para 4-8, as needed.
Check all tools and equipment to be sure every item is accounted for, in good condition, clean, and properly mounted
or stowed.
(3)
Follow general procedures for all services and inspections.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |