Click here to make tpub.com your Home Page

Page Title: AIR RESERVOIR NO. 1 REPLACEMENT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-385-14
4-41. AIR RESERVOIR NO. 1 REPLACEMENT.
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Tools and Special Tools
Equipment Condition
Tool Kit, General Mechanic's: Automotive
Wheels chocked, (Para 2-20)
(Item 50, Appendix J)
Drawbar lowered, (Para 2-23)
Cap and Plug Set (Item 2, Appendix J)
Air system drained, (Para 2-21)
Materials/Parts
Sealing Compound (Item 17, Appendix E)
Tags, Identification (Item 23, Appendix E)
Locknut (4) (Item 26, Appendix I)
a.
Removal.
Equipment may be damaged by foreign matter if hoses, tubes, and connectors are not plugged
and capped when removed.
NOTE
Tag all air lines and fittings prior to removal.
Cap and plug all air lines and connectors after removal.
(1)
Remove air lines 2228 (1), 2248 (2) and 2224 (3) from three elbows (4), (5) and (6).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business