|
|
TM 9-2330-385-14
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Tools and Special Tools
Equipment Condition
Tool Kit, General Mechanic's: Automotive
Wheels chocked, (Para 2-20)
(Item 50, Appendix J)
Drawbar lowered, (Para 2-23)
Cap and Plug Set (Item 2, Appendix J)
Air system drained, (Para 2-21)
Materials/Parts
Sealing Compound (Item 17, Appendix E)
Tags, Identification (Item 23, Appendix E)
Locknut (4) (Item 26, Appendix I)
a.
Removal.
Equipment may be damaged by foreign matter if hoses, tubes, and connectors are not
plugged and capped when removed.
NOTE
Tag all air lines and fittings prior to removal.
Cap and plug all air lines and connectors after removal.
(1)
Remove air lines 2605 (1), 2606 (2) and 2019 (3) from elbows (4), (5) and (6).
(2)
Remove drain valve (7) from air reservoir (8) and allow it to hang from cable (9).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |