Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance:
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-385-14
(28)
Tighten locknuts (17) until mounts (19) are
compressed to 1/4 in. (6.35 mm).
(29)
Install air lines 2022 (13) and 2023 (14) on
fittings (15) and (16).
(30)
Install air lines 2620 (9) and 2605 (10) on
elbows (11) and (12).
(31)
Install air lines 2143 (4), 2142 (3), 2424 (2)
and 2260 (1) on elbows (8), (7), (6) and (5).
c.
Follow-On Maintenance:
Charge air system, (Para 2-22).
Check for air leaks, (Para 4-7).
Remove wheel chocks, (Para 2-20).
END OF TASK
4-497

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business