|
|
![]() TM 9-2330-385-14
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Tools and Special Tools
Equipment Condition
Tool Kit, General Mechanic's: Automotive
Wheels chocked, (Para 2-20)
(Item 50, Appendix J)
Drawbar lowered, (Para 2-23)
Cap and Plug Set (Item 2, Appendix J)
Air system drained, (Para 2-21)
Material/Parts
Sealing Compound (Item 17, Appendix E)
Sealing Compound (Item 19, Appendix E)
Tags, Identification (Item 23, Appendix E)
Locknut (2) (Item 29, Appendix I)
a.
Removal.
Equipment may be damaged by
foreign matter if hoses, tubes,
and connectors are not plugged
and capped when removed.
NOTE
Tag and mark all air lines
and fittings before removal.
Cap and plug all air lines
and connectors after
removal.
(1)
Remove air lines 2080 (1) and 2078 (2)
from fittings (3) and (4).
(2)
Turn knob (5) counterclockwise and remove
from shaft (6).
(3)
Remove nut (7) from load lock valve (8).
(4)
Remove two locknuts (9), screws (10) and
load lock valve (8) from bracket (11).
Discard locknuts.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |