|
|
TM 9-2330-385-14
(2)
Install reinforcement plate (2) in holes (4) in trailer chassis (5).
(3)
Remove locking pin (6) from reinforcement plate (2).
(4)
Remove transport pin (7) from clip (8) and bracket (9).
(5)
Insert transport pin (7) through hole (10) in reinforcement plate (2), hole (11) in flatrack (12) and hole
(not shown) in trailer rail (13).
(6)
Install locking pin (6) through two tabs on reinforcement plate (2) to secure transport pin (7).
(7)
Repeat steps (1) through (6) for remaining transport pin (7).
Marking. Refer to AR 746-1 for Marking of Supplies for Shipment.
b.
c.
Preparation After Rail Shipment.
(1)
Remove locking pin (6) from reinforcement plate (2).
(2)
Remove transport pin (7) from hole (11) in flatrack (12), hole (10) in reinforcement plate (2) and hole
(not shown) in trailer rail (13).
(3)
Install transport pin (7) on bracket (9) and clip (8).
(4)
Remove reinforcement plate (2) from holes (4) in trailer chassis (5).
(5)
Install reinforcement plate (2) on studs (3) with two locknuts (1).
(6)
Install locking pin (6) on reinforcement plate (2).
(7)
Repeat Steps (1) through (6) for remaining transport pin (7).
d.
Follow-On Maintenance:
Remove wheel chocks, (Para 2-20).
END OF TASK
4-571
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |