Click here to make tpub.com your Home Page

Page Title: RAIL SHIPPING INSTRUCTIONS.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-385-14
4-75. RAIL SHIPPING INSTRUCTIONS.
This task covers:
a. Preparation Prior to Rail Shipment
c. Preparation After Rail Shipment
b. Marking
d. Follow-On Maintenance
INITIAL SETUP
Tools and Special Tools
References
Tool Kit, General Mechanic's: Automotive
AR 746-1
(Item 50, Appendix J)
TM 9-2320-364-10
Equipment Condition
Material/Parts
Wheels chocked, (Para 2-20)
Locknut (4) (Item 22, Appendix I)
Flatrack locked to trailer, (Para 2-13)
a.
Preparation Prior to Rail Shipment.
Rail load locking pins must be installed to lock flatrack to trailer for rail transport. Failure
to use locking pins to lock flatrack to trailer could cause severe injury or death to personnel.
NOTE
Right and left rail-load locking pins are installed the same way.
Refer to TM 9-2320-364-10 and insure that the flatrack rollers are against the stops at rear of
trailer. This will help to align the holes in the trailer and flatrack.
(1)
Remove two locknuts (1) and reinforcement plate (2) from studs (3). Discard locknuts.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business