|
|
TM 9-2330-385-14
This task covers:
a. Removal
c. Cleaning/Inspection
e. Installation
b. Disassembly
d. Assembly
f. Follow-On Maintenance
INITIAL SETUP
Tools and Special Tools
Materials/Parts
Tool Kit, General Mechanic's
Tags, Identification (Item 23, Appendix E)
(Item 49, Appendix J)
Personnel Required
Brush, Wire Scratch (Item 1, Appendix J)
Two
Cap and Plug Set (Item 2, Appendix J)
Goggles, Industrial (Item 13, Appendix J)
References
Jackstand (4) (Item 24, Appendix J)
TC 9-237
Lift, Transmission (Item 26, Appendix J)
TB 43-0209
Respirator, Air Filtering (Item 36, Appendix J)
Socket Set, 1 in. (Item 38, Appendix J)
Equipment Condition
Front wheels chocked, (Para 2-20)
Socket, Set, 3/4 in. (Item 39, Appendix J)
Wheels removed, (Para 4-57)
Welding Machine, Arc (Item 52, Appendix J)
Axle tiedown brackets removed (#3 axle only),
Wrench, Impact Electric, 1 in. External
(Item 59, Appendix J)
(Item 62, Appendix J)
a.
Removal.
Axle assembly weighs 1,565 lbs (710 kg). Attach suitable lifting device prior to removal to
prevent possible injury to personnel.
NOTE
Both axles are removed the same way. Axle No. 3 shown.
(1)
Position jackstands under spring hanger assembly (1).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |