|
|
TM 9-2330-385-14
This task covers:
a. Alignment
b. Follow-On Maintenance
INITIAL SETUP
Tools and Special Tools
Tools and Special Tools - Continued
Tool Kit, General Mechanic's
(Item 49, Appendix J)
(Item 62, Appendix J)
Dividers, Mechanics (Item 6, Appendix J)
Personnel Required
Jack (Item 22, Appendix J)
Two
Jack, Stabilizer 56 in. (2) (Item 23, Appendix J)
Jackstand (2) (Item 24, Appendix J)
Materials/Parts
Plumb Bob (Item 33, Appendix J)
Chalk, Marking White (Item 9, Appendix E)
Socket Set, 1 in. (Item 38, Appendix J)
Tape Adhesive (Item 24, Appendix E)
Socket, Set, 3/4 in. (Item 39, Appendix J)
Equipment Condition
Tape Measurer (Item 47, Appendix J)
Wheels chocked, (Para 2-20)
Wrench, Impact Electric, 1 in. External
(Item 59, Appendix J)
a.
Alignment.
NOTE
Both front tires must be approximately one in. (25 mm) off the floor.
Ensure stabilizer jacks do not interfere with a straight line between center of Axle No. 1
and ends of Axle No. 2.
(1)
Using stabilizer jacks, raise and support front of trailer frame (1).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |