|
|
TM 9-3990-206-14&P
2-9. SIDEBOARD KIT.
a.
Installation.
2
5
4
1
3
Sideboards and straps secure the load to flatrack. Install sideboards and straps to flatrack
before trying to move load or damage to equipment or the load may result.
NOTE
Refer to illustration for correct panel location.
For installation of panels No. 9 and No. 10, refer to Para 4-19.
(1)
Line up stakes (1) of sideboard sections (2) with pockets (3) on flatrack. Push sideboard sections down
until seated in pockets.
(2)
Anchor sideboard sections (2) to sideboard pockets (3) with retaining clips (4).
(3)
Install tiedown straps to cargo.
b.
Removal.
(1)
Remove tiedown straps from cargo and stow in stowage box (5).
(2)
Remove retaining clips (4) from sideboard pockets (3) and stakes (1).
(3)
Lift sideboard sections (2) out of pockets (3).
PROCEDURES.
Perform Chemical, Biological, and Radiological Decontamination procedures.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |