|
|
![]() TM 9-3990-206-14&P
7-20. PREPARATION FOR RAIL TRANSPORT (CONT).
b.
Preparation After Rail Transport (With Load).
(1)
Position pry bar (3) in eyelet of load binder (2) and loosen load binder (2) using handle (11).
(2)
Remove chain (1) from hook (10) of load binder (2).
(3)
Remove load binder (2) and T-hook (5) from slot (6) on upper corner of rear wall (9).
(4)
Remove chain (1) and T-hook (5) from slot (6) on upper corner of front wall (7) and middle 25K tiedown
ring (8).
(5)
Repeat Steps (1) through (4) for remaining side.
(6)
Stow two chains (1), load binders (2) and pry bar (3) in stowage boxes (4).
7-30
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |