Click here to make tpub.com your Home Page

Page Title: Preparation After Rail Transport (With Load).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-3990-206-14&P
7-20. PREPARATION FOR RAIL TRANSPORT (CONT).
b.
Preparation After Rail Transport (With Load).
(1)
Position pry bar (3) in eyelet of load binder (2) and loosen load binder (2) using handle (11).
(2)
Remove chain (1) from hook (10) of load binder (2).
(3)
Remove load binder (2) and T-hook (5) from slot (6) on upper corner of rear wall (9).
(4)
Remove chain (1) and T-hook (5) from slot (6) on upper corner of front wall (7) and middle 25K tiedown
ring (8).
(5)
Repeat Steps (1) through (4) for remaining side.
(6)
Stow two chains (1), load binders (2) and pry bar (3) in stowage boxes (4).
7-30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business