Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR RAIL TRANSPORT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-3990-206-14&P
7-20. PREPARATION FOR RAIL TRANSPORT.
a.
Preparation for Rail Transport (With Load).
(1)
Remove two chains (1), load binders (2) and pry bar (3) from stowage boxes (4).
(2)
Install T-hook (5) on chain (1) into slot (6) on upper corner of front wall (7). Rotate T-hook (5) to lock in
place.
(3)
Position chain (1) through middle 25K tiedown ring (8).
(4)
Install T-hook (5) on load binder (2) into slot (6) on upper corner of rear wall (9). Rotate T-hook (5) to
lock in place.
(5)
Extend load binder (2).
(6)
Take up slack of chain (1) and attach tightest link of chain (1) into hook (10) of load binder (2).
Ensure T-hooks are locked into place before tightening load binders. T-hooks, chain and
load binders could come apart causing serious injury to personnel.
NOTE
Positioning pry bar in eyelet of load binder will prevent chain from twisting.
(7)
Position pry bar (3) in eyelet of load binder (2) and tighten load binder (2) using handle (11).
(8)
Repeat Steps (2) through (7) for remaining side.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business